QUOTE · EXAMPLE-001 · REVISION 1

Fictional entryway refresh

Fictional Cedar Workshop
Sample business · replace before sharing

Prepared for Fictional Rowan Client
Sample client · no real contact details

Issued 2026-10-18 · Valid until 2026-11-01

DescriptionQtyUnit CADLine CAD
Preparation and painting labour12.5CAD 65.00CAD 812.50
Paint and consumables allowance1CAD 180.00CAD 180.00
Optional trim refreshOptional · excluded from total1CAD 140.00CAD 140.00

Included subtotalCAD 992.50

Discount−CAD 49.63

Tax (5%)CAD 47.14

Total CADCAD 990.01

Deposit (30%)CAD 297.00

Remaining balanceCAD 693.01

Optional items marked excluded are outside all totals. Tax uses the rate entered by the preparer.

scope

Prepare and repaint the interior entryway walls described below. This is a fictional demonstration, not a real offer.

deliverables

One entryway, up to 18 m² of wall area. Surface preparation and two coats of the agreed colour. Final walkthrough and tidy-up.

exclusions

Ceilings, trim, water damage, electrical work and hidden repairs. Optional trim work is excluded unless selected.

assumptions

Client clears furniture and provides access. Existing surfaces are sound. A site inspection may change this estimate.

timeline

Proposed two working days after written acceptance and mutually agreed scheduling.

Payment & working terms

30% deposit after acceptance. Remaining balance on completion after the walkthrough. Changes require a separately agreed revision before work begins.

notes

Fictional sample only. The sample tax rate is an arithmetic example, not a recommendation for any location.

Approval checklist

Review scope, optional items, dates, tax treatment and payment terms together. Record acceptance using your own agreed process. This document does not collect a signature or payment.